After being completely hydrolyzed. the following procedure is alkali & water washing. high pressure water washing and ultrasonic washing to remove titanium dioxide in the filter core. At last, after passing the bubble test. it can be used.
Addr : Yifeng Industrial Park, Yancheng, Jiangsu Tel : 0515-89966333 Fax : 0515-88661858
Mob : (0)13851053669 Website : www.ydty.net E-mail : ydty@sina.com Post Code:224022
Copyright © 2017 Jiangsu Tongya Electric Heating Technology Co., Ltd All rights reserved Jiangsu ICP No. 17012680